Product Introduction
introduction: Imported high-performance polymer emulsion as the film-forming base material, with very fine hollow ceramic beads of different particle size grades as fillers, and a variety of functional additives.
Uses: suitable for building exterior walls and roofs; industrial gas storage tanks and pipelines; grain depots, warehouses, cold storage, food and drug workshops
product characteristics
1. It can improve the internal temperature environment, improve the safety and stability of low-temperature preservation of stored products, and delay the aging of quality.
2. The high barrier property of thermal insulation coating to solar radiant heat can significantly reduce the surface temperature and indoor temperature of roof and exterior wall, improve living environment and reduce energy consumption
3, in the industrial container and pipeline coating, can replace the traditional spray cooling, the surface temperature can be reduced by 20 ℃, save water resources at the same time also reduces the corrosion of water to the tank
related Notes
1. Theoretical dosage: about 2.8 m2/kg, dry film thickness of 250 microns
2. Packing specification: 18L, 20L, 50L
3. Storage conditions: under the condition of 5 ℃-35 ℃, prevent freezing or exposure
4, shelf life: 12 months, prohibit the use of this product below 5 ℃
CONSTRUCTION CONDITIONS
1. The construction environment temperature is above 5 ℃, and the air relative humidity is ≤ 80%
2, the wall to be flat (except for special effects) strong, no cracks and damage
3. PH value of wall ≤ 10, moisture content ≤ 10%
construction steps
1. The flatness and verticality of the base course shall meet the requirements of the existing specifications and pass the acceptance.
2, for the new cement mortar and concrete base should be maintained for more than 14 days in summer and more than 28 days in spring and autumn, so that the PH value is less than 10 and the moisture content is less than 10%
3, remove the grass-roots floating ash, oil, local repair after perfect scraping flexible waterproof putty
4, brush anti-alkali sealing primer, the impact of the coating quality of the basic alkaline substances to further closed
5. After the putty layer is fully cured, the roller coating method can be used to construct the thermal insulation coating, and the second time can be constructed after the first time is fully dried.
6. There is no need to add water during construction, and the general construction can be completed three times.